New Case Study: WMS Transforming Forches Avenue

Read our latest case study about the refurbishment works at 1–11 & 12–23 Forches Avenue, North Devon, successfully completed by WMS. This project delivered enhancied aesthetics, improvied energy efficiency, and addressed long-standing weather-related issues.

 

Read more

WMS Somerset Team Continues to Shine!

Another fantastic achievement from our Somerset tradesmen—delivering quality and consistency time after time. Huge congratulations to Paul and the entire team for their outstanding work and commitment to excellence!
Keep raising the bar guys!

Read more

Attention to Detail Makes All the Difference!

The WMS Devon Painting Team continues to impress with their precision and professionalism. As specialists in working within live business environments, they ensure minimal disruption to day-to-day operations while delivering exceptional results.
Huge thanks to Martin, John, and the entire team for their outstanding work!

Read more

WMS CASE STUDIES

WMS Transforming Forches Avenue: A Modern Upgrade for Lasting Impact!

We’re proud to share the successful completion of refurbishment works at 1–11 & 12–23 Forches Avenue, North Devon. The project focused on enhancing aesthetics, improving energy efficiency, and addressing long-standing weather-related issues.

What We Delivered:

  • Cavity Wall Insulation – Removed outdated materials and installed energy-efficient insulation.
  • Render Repairs – Restored damaged areas for durability and visual appeal.
  • Roofline Adjustments & Repairs – Extended verges, refurbished soffits, fascias, and rainwater goods.
  • Modern Cladding – Installed Marley Cedral Click cladding for a sleek, low-maintenance finish.
  • Porch Roof Upgrades – Applied GRP coverings and constructed pitched roofs for better drainage and aesthetics.

Led by:
WMS Senior Contracts Manager Matt Kempster and our Planned Maintenance Team from Bideford, whose professionalism ensured outstanding results and positive client feedback.

The Outcome:
A revitalised look, improved energy performance, and a durable finish that enhances both functionality and kerb appeal.

Read more

WMS Case Study: Chichester House Fire Safety Upgrade!

Project: Major Internal Refurbishment and Fire Safety Enhancements

Overview

WMS have successfully delivered a comprehensive fire safety upgrade and internal refurbishment at Chichester House, an iconic 19-storey residential block in Plymouth. Commissioned by Hastoe Housing Association, this project significantly improved the building’s safety, resilience, and compliance with modern fire regulations.

Scope of Works

  • Replacement of 69 apartment doors with fire-rated composite door sets
  • Installation of FD60S-compliant fire-rated inner lobby doors - all other doors replaced to FD30S.
  • Replacement of 18 bin chute door sets
  • Upgrade of 18 electrical cupboard door sets, including compliant closers and ironmongery
  • Replacement of all ground floor communal doors, including pump room entrance
  • Full electrical upgrade of the mains room, plus associated remedial works throughout the building


Finishing Touches

To strengthen fire safety in communal areas, Crown Paints carried out flake tests and specified Crown Trade Timinox Flame Retardant Acrylic Eggshell for all 18 lift lobbies. As part of a joint social value initiative with WMS Crown Paints donated the product and our WMS Devon Painting Team delivered the project to the highest standards. The Team meticulously prepared all surfaces, applied multiple coats of flame retardant finish and ensured every lobby met both aesthetic and fire protection specifications. Their attention to detail and commitment to quality helped deliver a safer more durable environment for residents!

Read more

Another Quality Minor Works Project by the WMS Team – Chudleigh!

Scope of Works:
Removal of existing chimney render and application of new render.
Safe removal of asbestos roof tiles by a licensed subcontractor.
Installation of a brand-new roof structure, complete with insulation.
Replacement of all rainwater goods with modern UPVC components.

Materials Used:
Sand, cement, lime for rendering.
Timber battens and roofing membrane.
Roof insulation.
Man made slate tiles.
UPVC rainwater goods.

Workforce:
Chimney rendering completed by our skilled in-house plastering operative.
Asbestos removal, roofing, and scaffolding handled by trusted specialist subcontractor partners.

Duration:
4 weeks - All delivered with minimal disruption and maximum efficiency. Great work once again by Peter and the Minor Works Team!

Read more

Testimonials

"I understand your team are finishing up this week and I just wanted to send some feedback through about how much of a pleasure it has been having them work outside for the past 7 months. Everyone has been so friendly, polite, clean, quiet, and courteous what an excellent team of workers you have.

A special mention to Reef. What a lovely gentleman he is, he clearly has a very keen eye for attention to detail! What an absolute asset he is to your company. I can honestly say I think we will miss seeing the WMS vans turn up in the morning! Never did I think I would say that about having contractors working outside our house, but it has been a pleasure and the buildings new make over looks outstanding."

WMS Somerset Client

"Just to say what a great job Peter and Jake did on the painting. They were so friendly, helpful and great workers. (Thanks also to Rob and Nathan!)"

Teresa

"Thanks ever so much for the hard work you have put into delivering a great service. Ryan, your attitude has been exceptional to resolving issues and putting the resident first. Riki, as discussed in the office on Friday, the positive feedback is also attributed to the efforts you are putting in to ensure accurate updates and great communication. Will you've been keeping clients happy for years now. Cheers mate. This is exactly the start to the contract that we were hoping for."

WMS Client

"Hello John Just wanted to say it’s been an absolute pleasure having the young man here to do the roof and walls he’s done an amazing job and the residents really like what he has done thank you so much."

Karen

"Tenant would like to say thank you very much for the operative out today, did a fantastic job, spot on with the pipes to the sink and doors. 10 out of 10!!"

Tash

"I would like to thank you all, including your subcontractors and in particular Nick who have all contributed to the very successful completion of the works which went without incident or delays throughout the entire Winter period. The works were also carried out to a good standard."

Rob

Read More

JOIN US

Please contact us at jobs@wms-gb.com or 01237 473000 if you feel you have skills to enhance the team at WMS! Good luck!!!

REGISTRATIONS & ACCREDITATIONS

workspace.jpgcontructonline.jpggreenaccord.jpginvestorsinpeople.jpgexor.jpgnic.jpgdulux-contract-partner.jpgsafecontractor.jpgqms14001.jpgqms9001.jpgtrustmark.jpg Cyber Essentials