Wyvern, Penryn, Cornwall

The project involved complete refurbishment of the property incorporating increasing bedroom and living area capacity, remodelling and construction of new wall layouts.

WMS were proud to be part of this complete refurbishment of this former HMO property to Student Accommodation.  There was complete installation of central heating, all en-suite shower rooms to bedrooms, new kitchen installation, ceramic tiling and all internal decoration.

The building was refurbished externally incorporating repairs, preparation and full decoration as required.

During the works, there were also replacements for some of the UPVC doors and windows, the wiring was partially upgraded as required and floor coverings were laid to new and existing sub floors.  Insulation was installed in the walls and roof space.

During the project we also had to install new water mains services.

The project was a complete success and the client was very pleased with the standard of finish and the timescales we adhered to.